Lane Road Branch Renovation, Upper Arlington Public Library
At Triad, we work to bring community aspirations to life. We value your vision and strive to build and care for the community you live in and leave for future generations.
-
Budget
$1 Million
-
Size
9,500 SQ. FT.
-
Client Contact
Greg Ramage, Assistant Director: (614) 641-2200
The Call: A Branch Designed for a Previous Era of Library Services
The Lane Road branch of the Upper Arlington Public Library had served the community for years, but the interior no longer reflected how people actually use a library. The finishes were dated, and the layout was organized around assumptions from a previous generation of library services. Patrons today want quiet reading spaces, collaborative work areas, digital access, children’s programming, and community gathering, often within the same visit. The existing layout did not support that range of uses. The library’s leadership decided it was time for more than a cosmetic refresh. The Lane Road branch needed to be rethought from the inside out.
Choosing a Partner Who Understands How Libraries Are Actually Used Today
A library renovation that stops at new finishes misses the opportunity to change how the spaces work. The library needed a partner who understood modern library programming, who could evaluate how the existing spaces were being used and how they needed to change, and who could translate that understanding into a design that feels genuinely different when patrons walk in. The library also needed the renovation to stay on budget, protect against unforeseen conditions, and maintain services during the work. They chose Triad.
The Decisions That Transformed the Branch from the Inside Out
The library’s leadership and stakeholders worked with Triad’s team to evaluate how the existing spaces were being used and how they needed to change. The renovation went beyond finishes to rethink how the spaces relate to each other. The layout was redesigned to create better adjacencies, improve patron flow, and organize the branch around modern library services: quiet reading, collaborative work, digital access, children’s programming, and community gathering.
Triad’s integrated interior design team selected new finishes throughout the branch that work together with the regrouped spaces to create a cohesive, modern, and welcoming environment. The finishes, furniture, lighting, and spatial design all contribute to an experience that feels genuinely different from what was there before.
Immersive 3D visualization helped the library’s leadership and stakeholders see the renovated branch before construction began. The visualization built confidence in the design decisions and ensured everyone was aligned on what the finished branch would look and feel like.
Unforeseen conditions in the existing building were managed with budget protections built in from the start. Library services continued during the renovation so patrons were not left without their branch. Every public dollar was maximized.
A Branch That Now Reflects How Its Community Actually Uses a Library
The Lane Road branch is now a modern, welcoming environment with spaces organized around how patrons actually use a library today. The finishes are new. The layout is rethought. The adjacencies support the diverse ways people engage with a library in one visit. Immersive visualization helped stakeholders see the transformation before it was built. The budget was protected. Services continued. And the community has a branch that reflects how they use it today, not how a previous generation used it. The Lane Road renovation was not a cosmetic refresh. It was a genuine transformation of how the branch serves its community.
“
The Triad companies listened carefully to our concerns and delivered creative solutions that have allowed us to better serve our community. Costs were well controlled, and a significant effort was made to understand and minimize the disruption to our operations during construction.
Gregory G. Ramage
Director of Support Services