Cesar Chavez / Midnimo Cross Cultural Middle School, Educational Solutions Company
At Triad, we work to bring community aspirations to life. We value your vision and strive to build and care for the community you live in and leave for future generations.
-
Size
73,000 SF
-
Delivery Method
Construction Manager at Risk
-
Client Contact
Dr. Robert Stephens, Executive Director: (614) 299-1007
The Call: A New Middle School Needed on a Budget and Schedule Conventional Construction Could Not Meet
Educational Solutions serves an underserved, vulnerable population. The organization needed to add a new middle school, the Midnimo Cross Cultural Middle School, alongside the existing Cesar Chavez elementary. The elementary also needed renovation. But the budget was limited, the schedule was tight, and conventional construction methods could not deliver both within the available resources. The school’s leadership had limited experience, limited staff, and the challenge of finding an approach that could meet the practical constraints without producing a building that felt like a compromise to the students who would use it every day.
Choosing an Innovative Approach Without Compromising the Student Experience
Modular construction was the only approach that could deliver a permanent new middle school within the budget and timeline. But choosing modular carries a perception risk: if the building does not feel intentional and designed, students and families will perceive it as temporary, regardless of its structural permanence. The school needed a partner who could make modular construction feel like a real school through design, not just deliver a building that checked the boxes. They also needed someone who could manage the fire separation between the new and existing buildings, renovate the elementary simultaneously, and protect the budget across both projects. They chose Triad.
The Decisions That Made a Modular Building Feel Like a Real School
The school and Triad chose modular construction for the new Midnimo Cross Cultural Middle School. The structure is permanent, not temporary. But the design challenge was making it feel that way to the students and families who would experience it. Triad’s team used strategic color choices and small but intentional design details throughout the building to create an environment that feels welcoming, designed, and permanent. In a modular building, these details matter more than in conventional construction because they are what separates a school that inspires from one that feels like a shortcut.
The new modular middle school was connected to the existing Cesar Chavez elementary. That tie-in required careful fire separation planning to meet building code requirements. Triad managed this proactively during design so that the connection between the two buildings was code-compliant from the start, avoiding complications during construction or occupancy.
While the new middle school was being built, the existing Cesar Chavez elementary was renovated to address its own deficiencies. The school managed both projects simultaneously, with Triad coordinating design and construction across both to deliver on budget and on schedule. Unforeseen conditions in the existing elementary were planned for, with protections in the budget ensuring that surprises did not affect the new construction.
A Permanent Middle School That Feels Designed, Not Compromised
The Midnimo Cross Cultural Middle School is a permanent facility that was delivered within the budget and schedule conventional construction could not meet. Strategic colors and intentional design details make the building feel welcoming and designed for the students inside it. The Cesar Chavez elementary was renovated and connected to the new middle school with fire separation managed proactively. Both projects were delivered on budget. Students from an underserved, vulnerable community now attend a middle school that was built using an innovative method but designed with the same intentionality as any conventional school. The construction method was practical. The student experience is not a compromise.